MIL-HDBK-516C decides whether a US military air system is airworthy. CertProve turns your own design data into the compliance record and the safety case that answer it
What this regime costs you today
Every criterion is answered, tailored with a reason, or open. There is no fourth state, and the record never invents one.
Your tailored criteria set is the contract
Agreed once, lived with for years. What you tailored out is as load bearing as what you kept.
The evidence is tracked by hand
Hundreds of criteria in spreadsheets, re-checked by people every time the design moves.
A claim is not a showing
The authority asks what stands behind it. Nothing behind it is a finding, and findings hold the clearance.
Every change reopens the argument
A new store, a new sensor, a new software load, and a team rediscovers what it touched.
Whatever you fly, it has to be proven
One handbook reaches the whole air system, from the airframe to what hangs off it
Fighter
Bomber
Airlifter
Tanker
Attack rotorcraft
Tiltrotor
Collaborative combat
Long endurance
Hypersonic
Air launched stores
What changes when the evidence derives itself
Adopting the criteria
todaytyped from the handbook into a matrix, one at a time
hereproposed from the handbook and diffed against what your programme already holds
Answering them
todaya person restates each criterion in a template
herethe compliance record renders from your data, criterion by criterion
Pricing a change
todaya working group rediscovers what the change touched
heredeclare it against the frozen baseline and read back what it reopens
Handing over the pack
todaya folder, and the gaps found by the reviewer
hereevery claim carries its showing, and the gaps are named before they are found
What we stand on, and what we will never do
we stand on
MIL-HDBK-516Cthe airworthiness criteria as published, not a summary of them
MIL-STD-882Ethe system safety process your programme plan and hazard analyses answer to
Your tailoringrecorded with its reason and its review item, so it survives a change of team
Your own programmethe records derive from your data and say plainly when something is missing
we will never
noApprove anythingthe authority decides. We assemble the evidence and sign nothing.
noInvent a citationwhere a standard is not held it is named, never quoted from memory.
noScore you out of tenno coverage figure, because certification is not a percentage.
noMove your datasingle tenant inside your own boundary, markings on every export.
Check us on itPick an air system and read every record this composes, set-asides and all
Bring a change you have already been through
Bring a change you have already certified. Six weeks on your own baseline, and you keep the report either way
your own baselinesix weeksevery engineyou keep the report either way